-
Nuclear Radiation Protection
-
Nuclear Radiation Detector
-
Copper Foil Shielding
-
RF Shielded Doors
-
RF Shielded Windows
-
Radiation Protection Lead Glass
-
Non Magnetic Tool Kit
-
RF Shielded Chamber
-
Honeycomb Waveguide Air Vents
-
Conductive Adhesive Copper Tape
-
Copper Wire Mesh
-
X Ray Lead Glass
-
EMI Shielding Gasket
-
Electrically Conductive Fabric
-
Radiation Protection Door
-
Radiation Protection X Ray
-
Faraday Cage MRI
-
Copper Wire Wool
-
MRI LED Lighting
-
Non Magnetic Wheelchair
-
Non Magnetic Stretcher
-
AnasBrass honeycomb vent Looks Very Nice -
SatheeshMRI/RF doors are shining with handles, Thank you My friend.
Density 5.2gcm3 Radiation Protection Lead Glass for CT Xray PET Linec Room Without Frame or With Frame Providing Shielding
| Brand Name | Jovi |
|---|---|
| Certification | CE |
| Model Number | 1-cf-15 |
| Document | Lead glass specification.pdf |
| Minimum Order Quantity | 1 Pc |
| Price | $600/pc-$7380/pc |
| Packaging Details | In Wooden Case Or Customized |
| Delivery Time | 5-8 Work Days |
| Payment Terms | L/C,T/T |
| Supply Ability | 2000 Pcs Per Month |
| Density | 5.2g/cm³ | Transmittance | 85% - 95% |
|---|---|---|---|
| Lead Equivalence | 1.5 Mm - 5.0+ Mm | Bubble Specification | <0.5 Bubbles >0.5 Mm Per 100 Cm² |
| CeO₂ Content | Nuclear Grade (CeO₂) | Flatness | <0.1% Of Diagonal |
| Highlight | Frame Design Lead Glass,Glass Shielding,Professional Radiation Shielding |
||
When evaluating lead glass suppliers for nuclear medicine and radiology, demand documented evidence for:
-
Measured lead equivalence (not theoretical) – with test method and uncertainty
-
Bubble specification – accept only <0.5 bubbles >0.5 mm per 100 cm²
-
Browning resistance – CeO₂ content and radiation stability test (500+ hours)
-
Traceability – laser‑etched serial number linking to batch test records
-
Warranty – minimum 5 years against discoloration, cracking, attenuation loss
Jovvi exceeds all five requirements.
| Modality | Annual Workload | Recommended Jovvi Product | Pb Eq. | Composite? | Typical Size |
|---|---|---|---|---|---|
| Dental X‑ray | <50 patients/week | Standard grade | 1.5 mm | No | 300×300 mm |
| General X‑ray | 100–200/week | Standard grade | 1.8–2.0 mm | No | 800×600 mm |
| Mammography | 50–100/week | Standard grade | 1.8 mm | No | 600×500 mm |
| CT (single‑source) | 30–60/day | Standard grade | 2.2–2.3 mm | No | 1200×800 mm |
| CT (dual‑source) | 40–80/day | Standard grade | 2.5 mm | No | 1500×1000 mm |
| SPECT | 20–40/day | Nuclear grade (CeO₂) | 2.5–3.0 mm | No | 1200×800 mm |
| PET‑CT | 20–50/day | Composite | 5.0+ mm eq. | Yes | 1500×1000 mm |
| High‑dose therapy (¹³¹I) | <10/week | Nuclear grade | 3.5–4.0 mm | No | 800×600 mm |
| Hot lab (fume hood) | Daily | Nuclear grade (small panel) | 2.5 mm | No | 400×300 mm |
| Interventional radiology | High fluoro | Standard grade | 2.5–3.0 mm | No | 1000×800 mm |
-
100% X‑ray inspection – every panel scanned for internal defects
-
Measured attenuation – not calculated (IEC 61331‑2 compliant)
-
Nuclear grade CeO₂ – prevents browning (test certificate included)
-
Edge chamfer – prevents chipping during installation
-
Stress‑relieved annealing – <20 nm/cm residual stress
-
Flatness guaranteed – <0.1% of diagonal
-
Laser‑etched serial number – full traceability
-
ISO 13485:2016 certified – medical device quality management
-
5‑year warranty – covers discoloration, cracking, attenuation loss
-
Post‑installation support – re‑certification and maintenance services
Phase 1 – Planning (4–6 weeks before order)
-
Determine modality (X‑ray, CT, SPECT, PET‑CT, or mixed)
-
Measure workload (patients/week or mAs/week)
-
Calculate required Pb equivalent (or use Jovvi free design service)
-
Confirm wall/frame can support glass weight
-
Obtain budget approval (include TCO, not just initial price)
Phase 2 – Ordering (3–6 weeks before delivery)
-
Select Jovvi product from matrix above
-
Provide exact rough opening dimensions (±2 mm)
-
Specify any custom features (holes, rounded corners, anti‑reflection coating)
-
Request nuclear supplement if SPECT/PET‑CT
-
Confirm lead time and shipping method
Phase 3 – Delivery & Installation
-
Inspect crate for damage before opening
-
Verify panel dimensions against shop drawing
-
Check for bubbles, scratches, orientation arrow
-
Follow Jovvi installation guide (torque specs, gasket, lead tape)
-
Perform post‑installation radiation leakage test
Phase 4 – Ongoing (annual)
-
Visual inspection for new bubbles, edge chips, discoloration
-
Re‑check torque on clamping bolts
-
Inspect lead tape perimeter
-
Conduct radiation survey (compare to baseline)
-
Record all results in shielding log

